電纜警示樁施工注意事項很多,比如:準(zhǔn)備的工作--相關(guān)儀器的檢查和矯正--進(jìn)行測量放線--固定交樁--規(guī)劃線路--調(diào)整交樁--完工后需要記錄相關(guān)信息。下面來講講它的施工準(zhǔn)備工作內(nèi)容。
There are many precautions for cable warning pile construction, such as: preparation -- inspection and correction of relevant instruments -- surveying and setting out -- fixed pile delivery -- planning route -- adjusting pile delivery -- recording relevant information after completion. Now let's talk about its construction preparation.
1、詳細(xì)查看研究放線區(qū)域的完整的施工作業(yè)圖紙。
1. Check the complete construction drawings of the study setting out area in detail.
2、提前準(zhǔn)備交樁記錄需要的表格及了解接樁組成人員便于溝通。
2. Prepare the forms required for the pile delivery record in advance and know the pile receiving personnel to facilitate communication.
3、準(zhǔn)備符合要求的測量儀器、木樁、標(biāo)筆、白石灰以及其他工具。
3. Prepare qualified measuring instruments, stakes, markers, lime and other tools.
4、將需要測量放線使用的工具進(jìn)行矯正,還需要保證這些工具須在規(guī)定的有效期范圍之內(nèi)。
4. The tools to be used for surveying and setting out shall be corrected, and it is also necessary to ensure that these tools are within the specified validity.
警示樁在操作方面需要注意:
Attention shall be paid to the operation of warning piles:
1、測量放線的基準(zhǔn)點一定要采用GPS定位,其中放線基準(zhǔn)點是指設(shè)計控制樁和水準(zhǔn)基樁。
1. The datum point of surveying and setting out must be positioned by GPS, among which the datum point of setting out refers to the design control pile and leveling pile.
2、一定要按照圖紙的作業(yè)要求設(shè)置控制樁,一定要表明樁號、里程、地面標(biāo)高、轉(zhuǎn)角高度等數(shù)據(jù)。
2. The control pile must be set according to the operation requirements of the drawings, and the pile number, mileage, ground elevation, corner height and other data must be indicated.
3、在定測資料和平面或是斷面圖紙上表明地下的障礙物,其次是,要保證線路和地下構(gòu)筑物交叉兩側(cè)的控制范圍為3米,同時,須要設(shè)置警告牌和警示樁。警示樁上須要寫上相關(guān)的數(shù)據(jù)。比如:埋深,交叉尺寸等。
3. The underground obstacles shall be indicated on the location survey data and plane or section drawings. Secondly, the control range on both sides of the intersection of the line and underground structures shall be 3 meters. At the same time, warning signs and warning piles shall be set up. Relevant data shall be written on the warning post. For example: buried depth, cross size, etc.
4、關(guān)于劃線方面,要根據(jù)軸線和警示樁的界限之間拉一根繩子,撒上白石灰劃線。完成劃線,要清理現(xiàn)場的障礙物。
4. In terms of scribing, a rope shall be drawn between the axis and the boundary of the warning pile, and white lime shall be sprinkled for scribing. Finish marking and clear the obstacles on site.
5、關(guān)于移樁方面,是在劃線完成之后打掃清理之前,將所有需要的線管樁平移到土堆的旁邊,范圍控制在0.3m。
5. In terms of pile moving, all the required line pipe piles shall be moved to the side of the soil pile after the completion of the lineation and before the cleaning, and the range shall be controlled within 0.3m.
電纜警示樁是埋設(shè)在天然氣高壓管線沿線以塑鋼、玻璃鋼、復(fù)合材質(zhì)為主,涂有黃色標(biāo)記的電纜走向警示樁,為起提示警示作用,您如果有需求就來我們網(wǎng)站
http://www.xqpxqpp.cn進(jìn)行咨詢吧!
Cable warning posts are mainly made of plastic steel, glass fiber reinforced plastic and composite materials, which are buried along the natural gas high-pressure pipeline and are painted with yellow marks. To serve as a warning, you can come to our website if you need http://www.xqpxqpp.cn Consult!