警示樁也叫警示樁、標(biāo)志樁等顧名思義是起到指示、提醒的作用的,一般用在公路交通、電力電纜、石油燃?xì)獾?,由于使用廣泛,作用重要,因此正確的警示樁(標(biāo)志樁)的設(shè)置是非常有必要的。下面我們來(lái)看看電纜警示樁施工時(shí)的安裝方法以及質(zhì)量要求內(nèi)容吧。
Warning piles are also called safety warning piles, sign piles, etc. as the name suggests, they play the role of indication and reminder. They are generally used in highway traffic, power cables, oil and gas, etc. because they are widely used and play an important role, it is very necessary to set correct warning piles (sign piles). Now let's take a look at the installation method and quality requirements of cable warning pile construction.
警示樁的質(zhì)量要求
Quality requirements for warning piles
1、質(zhì)量要求按圖紙?jiān)O(shè)計(jì)和施工技術(shù)規(guī)范及業(yè)主要求進(jìn)行。
1. The quality requirements shall be in accordance with the drawing design and construction technical specifications and the owner's requirements.
2、道口標(biāo)樁、警示樁應(yīng)保證標(biāo)樁垂直無(wú)歪斜,并保證位置正確,顏色鮮明、醒目。
2. The crossing stake and warning stake shall ensure that the stake is vertical without skew, and the position is correct, and the color is bright and eye-catching.
3、道口標(biāo)樁在公路沿線(xiàn)較小交叉路口的兩側(cè)對(duì)稱(chēng)設(shè)置,每側(cè)一根,用來(lái)提醒主線(xiàn)車(chē)輛提高警惕。
3. The crossing stake is symmetrically set on both sides of the smaller intersections along the highway, one on each side to remind the mainline vehicles to be vigilant.
4、埋設(shè)深度、間距、高出地面尺寸嚴(yán)格按設(shè)計(jì)圖紙施工。
4. The buried depth, spacing and height above the ground shall be constructed in strict accordance with the design drawings.
警示樁施工方法
Construction method of warning pile
1、工藝流程。施工區(qū)域交通管制→施工放樣→基礎(chǔ)施工(鉆機(jī)鉆孔)→警示樁加工制作→現(xiàn)場(chǎng)安裝(灌漿、安管)→現(xiàn)場(chǎng)清理、撤離。
1. Process flow. Traffic control in the construction area → construction setting out → foundation construction (drilling rig) → warning pile processing and fabrication → site installation (grouting and pipe installation) → site cleaning and evacuation.
2、施工放樣。警示樁為新增工程量,安裝位置由業(yè)主、監(jiān)理單位現(xiàn)場(chǎng)確定。
2. Construction setting out. Warning piles are new quantities, and the installation position shall be determined by the owner and the supervisor on site.
3、警示樁基礎(chǔ)。警示樁基礎(chǔ)孔洞為鉆機(jī)鉆孔,孔深30cm,直徑150mm(根據(jù)警示樁的采購(gòu)規(guī)格設(shè)計(jì))。按照?qǐng)D紙規(guī)范鉆孔,并將樁底正平壓實(shí)。
3. Warning pile foundation. The warning pile foundation hole is drilled by a drill, with a hole depth of 30cm and a diameter of 150mm (designed according to the purchase specification of the warning pile). Drill holes according to the drawings and specifications, and compact the pile bottom.
警示樁安裝
Installation of warning pile
(1)警示樁安裝應(yīng)保證樁柱垂直無(wú)歪斜,并保證位置正確,顏色鮮明、醒目。
(1) The installation of warning piles shall ensure that the piles are vertical without deflection, and that the positions are correct and the colors are bright and eye-catching.
(2)警示樁安裝完畢后應(yīng)進(jìn)行路面清掃,在清掃過(guò)程中,不應(yīng)損壞樁身反光膜或產(chǎn)生其他缺陷。
(2) After the installation of warning piles, the road surface shall be cleaned. During the cleaning process, the pile reflective film shall not be damaged or other defects shall not occur.
(3)
電纜警示樁樁內(nèi)采用M10砂漿灌漿,地下部分深度為30cm。
(3) M10 mortar is used for grouting in the pile, and the depth of the underground part is 30cm.
以上就是問(wèn)題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對(duì)這一問(wèn)題還存在任何疑問(wèn),都?xì)g迎關(guān)注我們網(wǎng)站
http://www.xqpxqpp.cn并咨詢(xún)我們的工作人員,將竭誠(chéng)為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.xqpxqpp.cn And consult our staff, will serve you wholeheartedly.